MCA-F-501/09, version 2 – 24 January 2025 — Serious Adverse Event (SAE) Report Form
Currentness under review. Whether this instrument remains applicable is under review. Consult the later instruments and source context below before relying on it.
Link directly to a passage with its anchor — for example #pdf-page-1 — to open it highlighted. This reference version is generated from the authority’s publication and does not replace it. Language: English.
Contents
MEDICINES CONTROL AGENCY
MCA
THE GAMBIA
SERIOUS ADVERSE EVENT (SAE)
MCA-F-501/09
REPORT FORM
MEDICINES CONTROL AGENCY
Off Bertil Harding Highway, Kotu East, Kanifing Municipality, P.O. Box 3162, Serekunda, The Gambia
Website: www.mca.gm; E-mail: info@mca.gm; Tel. No.: +2204380632
Protocol Number MCA CT No
PACTR No Other numbers
Principal Investi-
gator
Clinical Trial Site
PARTICIPANT INFORMATION (at time of SAE onset)
Participant Age Sex
Date of Birth
ID Day/Month/Year
SERIOUS ADVERSE EVENT
Outcome of Event
Event onset
Day/Month/Year ☐ Ongoing ☐ Recovered ☐ Unknown
Tick all appropriate to adverse event
☐ Participant died ☐ Involved or prolonged hospitalisation
☐ Life threatening ☐ Involved in persistent orsignificant disability or
incapacity
Describe event(s) in detail (including relevant tests/lab data)
MCA-F-501/09, version 2 – 24 January 2025 Page 1 of 2
Original PDF page 1 — retained source fields, tables and layout.
Serious Adverse Event Report MCA The Gambia
INVESTIGATIONAL MEDICINAL PRODUCT INFORMATION Blinded: ☐ Yes ☐ No
Start date Stop date
IMP Name/Identifier Route Daily Dose/Unit
Day/Month/Year Day/Month/Year
CONCOMITANT MEDICATION OR AUXILIARY MEDICINE (exclude those used to treat event)
Start date Stop date
Generic name Indication Daily Dose Route
Day/Month/Year Day/Month/Year
ASSESSMENT OF CAUSALITY WITH IMP
SAE is related to IMP:
☐ Definite ☐ Probable ☐ Possible ☐ Unlikely ☐ Unrelated
Did event reappear
Did event abate
after stopping IMP
☐ Yes ☐ No ☐ NA after IMP reintroduc- ☐ Yes ☐ No ☐ NA
tion
TYPE OF REPORT
Date of this re- Date site aware of
port Day/Month/Year SAE Day/Month/Year
☐ Initial Report ☐ Follow-up report # _____
Principal Investigator Signature Date
OFFICIAL USE
Date received: MCA SAE number:
Comments:
MCA-F-501/09, version 2 – 24 January 2025 Page 2 of 2
Original PDF page 2 — retained source fields, tables and layout.