Government Notice No. 80 of 2025 — Regulations for Decommissioning of Facilities: Atomic Energy and Radiation Protection Act, 2005
Currentness under review. Whether this instrument remains applicable is under review. Consult the later instruments and source context below before relying on it.
Link directly to a passage with its anchor — for example #pdf-page-1 — to open it highlighted. This reference version is generated from the authority’s publication and does not replace it. Language: English.
Contents
GOVERNMENT GAZETTE
OF THE
REPUBLIC OF NAMIBIA
N$18.40 WINDHOEK - 20 March 2025 No. 8603
CONTENTS
Page
GOVERNMENT NOTICES
No. 80 Regulations for decommissioning of facilities: Atomic Energy and Radiation Protection Act, 2005 1
________________
Government Notice
MINISTRY OF HEALTH AND SOCIAL SERVICES
No. 80 2025
REGULATIONS FOR DECOMMISSIONING OF FACILITIES:
ATOMIC ENERGY AND RADIATION PROTECTION ACT, 2005
Under section 43 of the Atomic Energy and Radiation Protection Act, 2005 (Act No. 5 of 2005), on
the recommendation of the Atomic Energy Board, I have made the regulations set out in the Schedule.
DR. K. SHANGULA
MINISTER OF HEALTH AND SOCIAL SERVICES Windhoek, 21 January 2025
Original PDF page 1 — retained source fields, tables and layout.
2 Government Gazette 20 March 2025 8603
SCHEDULE
ARRANGEMENT OF REGULATIONS
PART 1
PRELIMINATY
1. Definitions
2. Purpose of regulations
3. Application of regulations
PART 2
PROTECTION OF PEOPLE AND ENVIRONMENT
4. Protection and safety
5. Graded approach
6. Assessment of safety
7. Planned discharges
8. Clearance of material from regulatory control
9. On-site and off-site monitoring
PART 3
MANAGEMENT OF DECOMMISSIONING
10. Responsibilities of licensees
11. Management system
12. Safety culture
13. Human factors
14. Inventory and records
15. Involvement of interested parties
16. Requirements for reporting to Authority
PART 4
DECOMMISSIONING STRATEGY
17. Selecting decommissioning strategy
PART 5
FINANCING OF DECOMMISSIONING
18. Financing of decommissioning
PART 6
PLANNING OF DECOMMISSIONING
19. Planning of decommissioning
20. Transition from operation to decommissioning
21. Final update of decommissioning plan
22. Documents in support of decommissioning plan
23. Other requirements
24. Deferred dismantling
Original PDF page 2 — retained source fields, tables and layout.
8603 Government Gazette 20 March 2025 3
PART 7
CONDUCT OF DECOMMISSIONING
25. Commencement of decommissioning actions
26. Phased approach
27. Management of structures, systems and components
28. Feedback of decommissioning experience
29. Radioactive waste management
30. Management of facility during period of deferral
PART 8
COMPLETION OF DECOMMISSIONING ACTIONS AND TERMINATION OF
AUTHORISATION FOR DECOMMISSIONING
31. Completion of decommission actions
32. Termination of decommissioning authorisation
33. On-site storage of radioactive material
PART 1
PRELIMINARY
Definitions
1. In these regulations a word or an expression to which a meaning has been assigned
in the Act has that meaning, and unless the context otherwise indicates ‒
“assessment” means the process and results of analysing systematically and evaluating the hazards
associated with sources and practices and associated protection and safety measures;
“decommissioning” means administrative and technical actions taken to remove some or all of the
regulatory controls from a facility;
“decommissioning actions” means the procedures, processes and work activities such as
decontamination or removal of structures, systems and components as described in the
decommissioning plan, which are carried out to achieve a progressive and systematic reduction in
radiological hazards now and in the future without imposing undue burdens on future generations;
“decommissioning plan” means a plan approved by the Authority which contains detailed information
on the proposed decommissioning of a facility, which plan includes a description of actions to be
taken in carrying out procedures, processes and work activities for the purposes of decommissioning;
“discharge” means a planned and controlled release to the environment of liquid or gaseous radioactive
material that originates from regulated facilities during operation;
“disposal” means the emplacement of radioactive waste in a facility without the intention of retrieval
of such waste;
“end state” ‒
(a) in relation to radioactive waste management, means the state of radioactive waste in the final
stage of radioactive waste management in which the waste is passively safe and does not
depend on institutional control; or
(b) in relation to decommissioning actions, means a predetermined criterion defining the point
at which a specific task or process is to be considered complete;
Original PDF page 3 — retained source fields, tables and layout.
4 Government Gazette 20 March 2025 8603
“facility” means a building and its associated land and equipment in which radioactive material was
or is still produced, processed, used, handled or stored on a scale with such a degree of hazard and
risk that require consideration for protection and safety;
“graded approach” means -
(a) an application of safety requirements that is commensurate with the characteristics of the
practice or source and with the magnitude and likelihood of the exposures; and
(b) in relation to a system of control, a process or method in which the stringency of the control
measures and conditions applied is commensurate, to the extent practicable, with the
likelihood and possible consequences of a loss of control and the level of risk associated
with a loss of control;
“land” includes the surface, subsurface soil horizons and any surface or subsurface water or aquifers
potentially affected by radioactive material;
“licence” means a licence issued to a licensee under section 21 of the Act;
“licensee” means ‒
(a) the holder of a licence; or
(b) the holder of a registration;
“management system” means a set of interrelated or interacting elements for establishing policies
and objectives and enables the objectives to be achieved in an efficient and effective manner;
“NORM” means radioactive material containing no significant amount of radionuclides other than
the naturally occurring radionuclides, including material in which the activity concentration of the
naturally occurring radionuclides has been changed by a process;
“permanent shutdown” means the state of a facility at which its intended operation has ceased and
will not be recommenced;
“phased approach” means a strategy for implementing decommission in phases;
“protection and safety” means the protection of people against exposure to ionising radiation or
radioactive material, and the safety includes the means for achieving the protection and safety,
preventing of accidents and mitigating the consequence of the accidents if the accidents occur;
“Radiation Protection and Waste Disposal Regulations” means the Radiation Protection and Waste
Disposal Regulations published under Government Notice No. 221 of 18 November 2011;
“registration” means registration referred to in section 18 of the Act;
“regulatory control” means a form of control or regulation applied to a facility or an activity by the
Authority for reasons related to radiation protection or the safety of radiation sources;
“safety assessment” means an assessment of all aspects of a practice that are relevant to the protection
and safety for a facility authorised by the Authority, including the sitting, designing and operating of
the facility;
“safety function” means a specific purpose that must be accomplished by a licensee for safety
of a facility or an activity to prevent or mitigate radiological consequences of normal operation,
anticipated operation occurrence and accident conditions;
Original PDF page 4 — retained source fields, tables and layout.
8603 Government Gazette 20 March 2025 5
“shutdown” means the cessation of operation of a facility;
“storage” means the holding of radioactive sources, spent fuel or radioactive waste in a facility that
provides for the containment of the source, fuel or waste with the intention of retrieval;
“system of control” includes a regulatory system and safety system; and
“the Act” means the Atomic Energy and Radiation Protection Act, 2005 (Act No. 5 of 2005).
Purpose of regulations
2. (1) The purpose of these regulations is to establish the safety requirements
applicable to the decommissioning of facilities, including the planning, conduct and completion of
decommissioning actions and the termination of the authorisation for the actions.
(2) These regulations specify the minimum requirements for the safety and protection
requirements applicable to decommissioning and do not prevent a licensee or any other person from
taking additional actions as may be appropriate and reasonably necessary to protect the environment,
health and safety of people.
Application of regulations
3. (1) These regulations apply to ‒
(a) facilities involving NORM, including facilities for the mining and processing of
radioactive ore;
(b) medical, industrial and research facilities in which radioactive materials and sources
are produced, received, used and stored;
(c) facilities for predisposal radioactive waste management such as treatment,
conditioning and storage facilities, and other supporting facilities associated with
radioactive waste management; and
(d) the control of radiological hazards and risks resulting from decommissioning.
(2) Despite subregulation (1), these regulations do not apply to ‒
(a) radioactive waste disposal facilities, including engineered NORM waste containments,
but apply to the decommissioning of supporting buildings and services of such
facilities;
(b) remediation of areas contaminated by residual radioactive material arising from past
activities that were ‒
(i) not subject to regulatory control; or
(ii) subject to regulatory control in a manner that is not in accordance with the
Act; or
(c) remediation of areas affected by a nuclear or radiological emergency, after the
emergency has been declared over.
Original PDF page 5 — retained source fields, tables and layout.
6 Government Gazette 20 March 2025 8603
PART 2
PROTECTION OF PEOPLE AND ENVIRONMENT
Protection and safety
4. (1) Exposure during decommissioning is considered as a planned exposure and
these regulations and the Radiation Protection and Waste Disposal Regulations must be complied
with during the decommissioning actions.
(2) The licensee must ensure that the ‒
(a) relevant dose limits for exposure of workers and members of the public; and
(b) relevant dose or risk constraints for occupational exposure and public exposure,
as set out in the Radiation Protection and Waste Disposal Regulations are applied during
decommissioning.
(3) For occupational and public exposure, the licensee must ensure that protection
and safety are optimised and relevant factors are taken into account in a manner that contributes to
achieving the following ‒
(a) to establish measures for protection and safety that are optimised for the prevailing
circumstances taking into account the available options for protection and safety as
well as the nature, likelihood and magnitude of exposure; and
(b) to establish criteria, based on the results of the optimisation, for the restriction of the
likelihood and magnitude of exposure by means of measures for preventing accidents
and mitigating the consequence of accidents that occur.
(4) During decommissioning the licensee must make provisions for protection against
exposure to radiation or radioactive material by preventing or reducing the likelihood of incidents
that could lead to exposure.
Graded approach
5. (1) The licensee must apply a graded approach to all aspects of the
decommissioning process which is consistent with the magnitude of the possible radiation risks
arising from decommissioning.
(2) The licensee must keep record of the way in which the graded approach is
implemented to ensure that the level of analysis, documents and actions implemented to comply with
the requirements for protection and safety are commensurate with.
(3) Without limiting the provisions of subregulation (2), the records or documents that
must be kept under that subregulation (2) includes ‒
(a) the type and purpose of the facility, such as the complexity of the facility, the products
or process involved;
(b) the particular characteristics of the facility;
(c) the stage of the facility within its lifetime, such as the age, status and condition;
(d) the relative importance to safety, safeguards and security and the magnitude of any
hazards involved;
Original PDF page 6 — retained source fields, tables and layout.
8603 Government Gazette 20 March 2025 7
(e) the relative importance of radiological and non-radiological hazards; and
(f) any other relevant factors.
(4) The licensee must re-assess the application of the graded approach during the ‒
(a) planning of the decommissioning plan, as the development of the decommissioning
plan progresses; and
(b) implementation of the decommissioning plan, as the decommissioning actions
progress,
depending on factors such as the complexity of the facility and the hazards involved in the
decommissioning actions.
(5) When applying the graded approach, the licensee must ensure that the
decommissioning plan, including the safety assessment carried out in or for any facility or activity is
consistent with the magnitude of the possible radiation risks arising from the facility or activity.
(6) The licensee must plan, organise, apply, audit and review the safety assessment
referred to in regulation 6 in a way that is in accordance with the graded approach.
(7) When a phased approach is applied to a decommissioning project, the licensee must
apply a graded approach to identify ‒
(a) the nature and extent of phases in terms of complexity and duration;
(b) the work to be performed and related techniques in each phase;
(c) the hazards and risks related to each phase;
(d) interdependencies between phases; and
(e) any milestones of the registration or licensing process and the periodic update of the
decommissioning plan and supporting documents.
Assessment of safety
6. (1) The licensee must assess the safety of decommissioning actions for all
facilities for which decommissioning is planned or ongoing.
(2) The decommissioning plan must be supported by a safety assessment addressing
the planned decommissioning actions and any incidents associated with such actions, including any
accident that may occur or a situation that may arise during decommissioning.
(3) The licensee must ensure that the safety assessment demonstrates that the planned
decommissioning actions meet all applicable safety requirements.
(4) The licensee must consult with the Authority before commencing with the safety
assessment to establish the scope and level of detail of the safety assessment for the facility or
activity and the resources that need to be directed to the safety assessment.
(5) The licensee must prepare the safety assessment so as ‒
Original PDF page 7 — retained source fields, tables and layout.
8 Government Gazette 20 March 2025 8603
(a) to identify the ways in which exposure may be incurred, taking into account the
effect of external events as well as of events directly involving the decommissioning
actions;
(b) to determine the expected magnitudes and likelihood of exposure in a normal
situation during decommissioning and, to the extent reasonable and practicable,
make an assessment of potential exposure; and
(c) to assess the adequacy of the provisions for protection of workers and members of
the public and the provisions for safety, including licensee response to incident and
accident.
(6) In developing the safety assessment, the licensee must ‒
(a) record how the required legal requirements and safety criteria are met to support the
authorisation of the proposed decommissioning actions;
(b) include a systematic evaluation of the nature, magnitude and likelihood of hazards
and their radiological consequences for workers, the public and the environment for
planned activities and for accident conditions;
(c) quantify the systematic and progressive reduction in radiological hazards to be
achieved through the conduct of the decommissioning actions;
(d) identify the safety measures, limit controls and conditions that will need to be applied
to the decommissioning actions to ensure that the relevant safety requirements and
criteria are met and maintained throughout the decommissioning;
(e) demonstrate that the institutional controls applied after decommissioning will not
impose an undue burden on future generations, where relevant;
(f) provide input to on-site and off-site emergency planning, where applicable, and to
safety management arrangements;
(g) identify training needs for decommissioning and competences for staff performing
decommissioning actions; and
(h) demonstrate the competence of the staff for the planned actions.
(7) The licensee must periodically review the safety of the facility being decommissioned
at frequencies specified by the Authority and the licensee must take into account ‒
(a) any changes that may significantly affect the safety of the facility or decommissioning
actions;
(b) significant developments in knowledge and understanding, including developments
arising from research or decommissioning experience;
(c) emerging safety issues raised by the Authority or a significant incident; and
(d) changes in the input data used in the safety analysis that may have significant
implication for safety.
(8) A licensee must appoint a qualified expert to conduct an independent verification of
the safety assessment on behalf of the licensee prior to finalising the safety assessment and before
submitting it to the Authority for review.
Original PDF page 8 — retained source fields, tables and layout.
8603 Government Gazette 20 March 2025 9
(9) The qualified expert referred to in subregulation (8) must undertake the verification
in a systematic manner and must record the approach, findings and recommendations, and the licensee
must, if requested, submit the verification to the Authority.
(10) The qualified expert referred to in subregulation (8) must ensure that ‒
(a) the input data and assumptions used are valid;
(b) the assessment accurately reflects the actual state of the facility and the
decommissioning actions;
(c) the safety measures derived from the safety assessment are adequate for the
decommissioning actions; and
(d) the safety assessment is kept updated to reflect changes to the facility and the
development of knowledge and understanding about it.
(11) Where a phased approach to decommissioning is used, an independent verification
must be performed by a qualified expert referred to in subregulation (8) to ensure that the safety
assessment for each phase is consistent with the overall safety assessment, and prior to commencing
a new phase of decommissioning, an independent verification must be performed to ensure that the
safety assessment has been appropriately updated.
(12) The development, verification and internal approval of the safety assessment for
decommissioning as part of the decommissioning plan must be part of the management system of the
facility.
Planned discharges
7. (1) The licensee must, in the decommissioning plan –
(a) declare its intention to manage discharges during the decommissioning;
(b) assess radiological consequences of discharges; and
(c) commit to manage the discharges in accordance with the Radiation Protection and
Waste Disposal Regulations.
(2) The licensee must ‒
(a) obtain authorisation from the Authority for any discharge of radioactive material into
the environment during the decommissioning action;
(b) determine the characteristics of the discharge and the possible location and method
of discharge;
(c) determine all significant exposure pathways by which discharged radionuclides
could give rise to exposure of members of the public;
(d) assess the doses to the representative person due to the planned discharge;
(e) assess radiological impacts on the environment in a manner that is integrated with
the features of the system of protection and safety; and
(f) promptly report to the Authority any unplanned discharge or discharge exceeding the
approved discharge limit, in the manner specified in the conditions of authorisation.
Original PDF page 9 — retained source fields, tables and layout.
10 Government Gazette 20 March 2025 8603
Clearance of material from regulatory control
8. (1) The licensee must in the decommissioning plan ‒
(a) declare any intention to clear material from regulatory control in accordance with the
Radiation Protection and Waste Disposal Regulations.
(b) describe the methodology to be used for clearing the material referred to in paragraph
(a), including any decontamination process involved; and
(c) set out a formal mechanism, including rigorous control measures to ensure that
radioactive material to be cleared complies with the relevant clearance criteria or
clearance levels approved by the Authority.
(2) The licensee must record in the management system relevant information on material
that has been cleared and must report this information to the Authority.
On-site and off-site monitoring
9. (1) The licensee must apply, review and modify as necessary its on-site and off-
site monitoring programme, as described in the decommissioning plan or its supporting documents,
to ensure that changes to the facility, specific hazards and effluents associated with decommissioning
are monitored and addressed appropriately.
(2) In the case of deferred dismantling, the licensee must ensure that a programme for
monitoring and surveillance is in place throughout the period of deferral.
(3) If the approved decommissioning end state involves ongoing restrictions on the
future use of the site, the licensee must establish and maintain appropriate controls and programmes
for monitoring and surveillance for the optimisation of protection and safety, and protection of the
environment.
(4) The Authority must approve controls and programmes for monitoring and
surveillance referred to subregulation (3).
(5) The licensee must assign clear responsibilities for implementing and maintaining the
controls and programmes for monitoring and surveillance referred to in subregulation (3) to ensure
compliance with the restrictions on the future use of the site.
PART 3
MANAGEMENT OF DECOMMISSIONING
Responsibilities of licensees
10. (1) The licensee is responsible for all aspects of protection and safety during
decommissioning and the licensee may not delegate the protection and safety responsibilities.
(2) The licensee must, in addition to the requirements imposed by these regulations,
comply with requirements imposed by the Authority as conditions of authorisation or as an order
given by the Authority.
(3) The licensee must plan for decommissioning and conduct the decommissioning
actions in compliance with the authorisation for decommissioning and other applicable laws.
Original PDF page 10 — retained source fields, tables and layout.
8603 Government Gazette 20 March 2025 11
(4) The licensee must identify any other persons that have specified roles and
responsibilities in terms of these regulations to ensure that decommissioning is properly managed.
(5) The responsibility of the licensee includes ‒
(a) establishing protection and safety objectives;
(b) selecting a decommissioning strategy as the basis for preparing, maintaining and
updating the decommissioning plan throughout the lifetime of the facility;
(c) preparing and submitting an initial decommissioning plan and subsequent updates of
the decommissioning plan for review by the Authority;
(d) establishing, implementing and maintaining the technical and organisational
measures that are needed to ensure protection and safety during the decommissioning
actions and for compliance with these regulations;
(e) establishing, implementing and maintaining a management system;
(f) estimating the cost of decommissioning actions and providing financial assurances
and resources to cover the costs associated with safe decommissioning, including
management of the resulting radioactive material and radioactive waste;
(g) notifying the Authority or other relevant authority prior to permanent shutdown of
the facility;
(h) managing the decommissioning project, conducting decommissioning actions and
ensuring oversight of the actions conducted by contractors;
(i) ensuring the safe management and control of any remaining operational waste from
the facility and all waste from decommissioning, and disposing of such waste in
accordance with the Radiation Protection and Waste Disposal Regulations;
(j) ensuring that the facility is maintained in a safe configuration during any period of
transition from permanent shutdown to the start of decommissioning actions;
(k) developing, implementing and documenting a protection and safety programme
commensurate with the radiation risks associated with the exposure situation and
sufficient to ensure compliance with the requirements of these regulations;
(l) performing safety assessments and environmental impact assessments in support of
decommissioning actions in accordance with the requirements of these regulations;
(m) preparing and implementing appropriate safety procedures, including emergency
plans, where appropriate;
(n) ensuring that properly trained, qualified and competent staff are available for the
decommissioning project;
(o) performing radiological surveys in support of decommissioning;
(p) verifying that the approved end state criteria have been met by performing a final
radiological survey;
(q) preparing and submitting a final decommissioning report to the Authority; and
Original PDF page 11 — retained source fields, tables and layout.
12 Government Gazette 20 March 2025 8603
(r) keeping records and submitting reports on decommissioning as required by the
Authority.
(6) If the performance of specific tasks is to be delegated to a contractor, the licensee
must appropriately control the work of the contractor to ensure that the work is conducted safely and
complies with these regulations and the Radiation Protection and Waste Disposal Regulations and
ensure that ‒
(a) the authorities and responsibilities for the specific task is clearly defined; and
(b) interface and communication route are clearly defined.
Management system
11. (1) The licensee must ensure that protection and safety is effectively integrated
into the management system of its organisation for all aspects of decommissioning.
(2) The licensee must demonstrate commitment to protection and safety at the highest
levels within its organisation.
(3) A management system must provide a single framework for the arrangements and
processes necessary to address all aspects relevant to decommissioning.
(4) The management system must enable the planning and implementation of
decommissioning actions to ensure that decommissioning is conducted safely.
(5) When the licensee delegates the performance of a defined task to a contractor, the
management system must contain provisions to ensure that the work of the contractor is appropriately
specified and controlled by the licensee and is conducted safely.
(6) The licensee must ensure that –
(a) individuals performing the safety assessment and decommissioning are properly
trained and have the necessary skills and expertise in safety assessment and
decommissioning;
(b) institutional knowledge about the facility being decommissioned is preserved and
accessible; and
(c) key staff members of the licensee involved in the facility being decommissioned are
retained as far as possible.
(7) The licensee must ensure that ‒
(a) persons performing decommissioning actions are aware of their responsibilities,
including informing the management of the licensee of any concerns about protection
and safety; and
(b) processes are in place to grant the necessary levels of authority and support to the
individuals if the individuals decide to suspend decommissioning actions for reasons
of protection and safety.
(8) The licensee must control the decommissioning process using written procedures
and such procedures are subject to review and approval by the responsible protection and safety
personnel of the licensee, and the licensee must establish procedures for issuing, modifying and
terminating work.
Original PDF page 12 — retained source fields, tables and layout.
8603 Government Gazette 20 March 2025 13
(9) If the licensee changes during the lifetime of the facility, the process of transferring
responsibility for protection and safety must be such as to ensure that responsibility for protection
and safety during the decommissioning phase remains clearly defined.
(10) The licensee must ensure that the management system is designed and implemented
in a manner that enhances protection and safety by ‒
(a) applying the requirements for protection and safety consistently with the Radiation
Protection and Waste Disposal Regulations;
(b) ensuring that protection and safety is not compromised by other requirements;
(c) providing for the regular assessment of performance for protection and safety and
the application of lessons learned from experience; and
(d) promoting the necessary safety culture.
(11) The licensee must ensure that protection and safety elements of the management
system are commensurate with the complexity and the radiation risks associated with the
decommissioning actions.
(12) The licensee must demonstrate the effective fulfilment of the requirements for
protection and safety in the management system to ensure that health, environmental, security,
quality and economic requirements are not considered separately from safety requirements, in order
to preclude the possible negative impact on safety.
(13) The licensee must implement within the management system a decision-making
process to address any modification to technique and tools during the conduct of decommissioning
actions and determines if the modification needs any additional review and approval by the Authority.
(14) The licensee must in the decommissioning plan record the scope, roles and rules of
the decision-making process and the key experts involved in the process, and records of the decision
must be kept and made available to the Authority on request.
Safety culture
12. The licensee must promote and maintain a safety culture by ‒
(a) promoting individual and collective commitment to protection and safety at all levels
of its organisation;
(b) ensuring that there is a common understanding of the key aspects of safety culture
within its organisation;
(c) providing the means by which the organisation supports individuals and teams in
carrying out their tasks safely and successfully, taking into account the interactions
between individuals, technology and the organisation;
(d) encouraging the participation of workers and their representatives and other relevant
persons in the development and implementation of policies, rules and procedures
dealing with protection and safety;
(e) ensuring accountability of the organisation and individuals at all levels for protection
and safety;
Original PDF page 13 — retained source fields, tables and layout.
14 Government Gazette 20 March 2025 8603
(f) encouraging open communication regarding protection and safety within the
organisation and with relevant parties, as appropriate;
(g) encouraging a questioning and learning attitude and discouraging complacency
regarding protection and safety; and
(h) providing means by which the organisation continually seeks to develop and
strengthen its safety culture, including appropriate training.
Human factors
13. (1) The licensee must develop, implement and maintain a human factors
programme to ensure that ‒
(a) new equipment and the development of procedures facilitate safe decommissioning
and use of equipment minimise the possibility that human errors will lead to
accidents, and reduce the possibility that indication of normal conditions and
abnormal conditions will be misinterpreted; and
(b) appropriate systems, structures, components and procedures are in place to ‒
(i) reduce, as far as practicable, the possibility that human error or inadvertent
action may give rise to accidents or other incidents leading to the exposure
of any person;
(ii) provide means for detecting, correcting and compensating for human errors;
and
(iii) facilitate protective and corrective actions in the event of failures of safety
systems or protective measures.
(2) The licensee must each year inform its employees of the importance of effective
safety measures and be trained in the implementation of such safety measures as appropriate.
(3) The licensee must develop the training programme, evaluate it periodically and
updated it as may be necessary.
Inventory and records
14. (1) The licensee must establish, maintain, archive and maintain accessible key
records relevant to the development of the decommissioning plan, updates on the decommissioning
plan and the final decommissioning report.
(2) The licensee must maintain up to date records of the materials and waste generated,
stored in the facility or transferred to another facility authorised by the Authority, specifying the
quantities, characteristics, treatment methods and destination of waste.
Involvement of interested parties
15. (1) The person applying for an authorisation for decommissioning must provide
interested parties with an opportunity to comment on the decommissioning plan before submitting
the application to the Authority.
(2) For the purposes of subregulation (1), the person referred to in that subregulation
must hold public consultations, publish the decommissioning plan in the media, share the plan with
interested persons or use any other method that the person considers it necessary and appropriate.
Original PDF page 14 — retained source fields, tables and layout.
8603 Government Gazette 20 March 2025 15
(3) The licensee must inform interested parties of any site restrictions, and the results of
monitoring and surveillance.
(4) The licensee must address inputs from the public before requesting for termination
of the authorisation for decommissioning.
Requirements for reporting to Authority
16. (1) The licensee must ‒
(a) submit a report to the Authority at intervals approved by the Authority on ‒
(i) the progress of the decommissioning actions, including a summary of the
monitoring results for workers and members of the public; and
(ii) discharges to the environment and promptly report any discharges exceeding
the authorised limits;
(b) notify the Authority as soon as practicable, but not later than 24 hours after the
discovery of any incident or accident;
(c) submit to the Authority, within 30 days after discovery of the incident or accident,
a written report stating the cause of the incident or accident, including details of
exposures, corrective measures and any other relevant information; and
(d) promptly inform the Authority of any abnormal situation which lead or may lead to
an increase of public exposure.
(2) The licensee must inform the Authority of any non-compliance with these regulations
with significant implications for safety within 24 hours.
(3) The licensee must submit to the Authority reports on any radioactive waste
generated during decommissioning in accordance with the Radiation Protection and Waste Disposal
Regulations.
(4) The licensee must ensure that information on normal decommissioning performance
as well as abnormal conditions and events significant to protection and safety is disseminated or
made available to the Authority and other interested parties as specified by the Authority.
PART 4
DECOMMISSIONING STRATEGY
Selecting decommissioning strategy
17. (1) The licensee is responsible for selecting a decommissioning strategy for its
facility, and the decommissioning strategy must be consistent with the national strategy on radioactive
waste management and the Radiation Protection and Waste Disposal Regulations.
(2) The decommissioning strategy must contain detailed particulars of the strategy,
including a description of the options, the overall timescales for the decommissioning of the facility
and the end state after completion of all decommissioning actions, and the licensee must indicate the
reasons for choosing the preferred option for decommissioning.
(3) For the strategy selected, the licensee must demonstrate that the facility is to be
maintained in a safe configuration at all phases of decommissioning and is to reach the specified
Original PDF page 15 — retained source fields, tables and layout.
16 Government Gazette 20 March 2025 8603
decommissioning end state as defined in the approved decommissioning plan, and that undue burden
is not to be imposed on future generation.
(4) If the shutdown of a facility is sudden, the decommissioning strategy must be
reviewed based on the situation that initiated the sudden shutdown of the facility to determine
whether revision of the strategy is required, and if the shutdown is caused by an accident, the facility
must be brought to a safe configuration before the decommissioning plan is implemented.
(5) For a site with more than one facility, the licensee must develop a site strategy for
decommissioning to ensure that interdependences between the facilities are taken into account in the
individual decommissioning plan for each facility, and the licensee must submit to the Authority the
site strategy.
PART 5
FINANCING OF DECOMMISSIONING
Financing of decommissioning
18. (1) The licensee is responsible for all costs involved in decommissioning and
the responsibilities of the licensee include ‒
(a) estimating the cost of the decommissioning actions, including management cost of
radioactive waste; and
(b) providing financial assurance and resources to cover the costs associated with safe
decommissioning, including management cost of radioactive waste.
(2) The licensee must periodically update cost estimates for the decommissioning
actions to be consistent with the most recent update of the decommissioning plan.
(3) The licensee must ensure that the amount of financial assurance is consistent with
the most recent cost estimate for the decommissioning actions, and the necessary financial resource
for providing the financial assurance is in place as soon as possible in a manner approved by the
Authority.
(4) In the event of a sudden shutdown of the facility, the licensee must put in place
measures to enable the accumulated financial resources to be used for decommissioning when they
are needed.
(5) If the decommissioned facility is to be released with restrictions on the future use of
the site, the licensee must make available financial assurance for ongoing monitoring, surveillance
and control of the site throughout the period specified by the Authority.
PART 6
PLANNING OF DECOMMISSIONING
Planning of decommissioning
19. (1) The licensee must take decommissioning into account when siting,
designing, constructing, commissioning, operating and modifying the facility in order to –
(a) facilitate decommissioning and record keeping; and
(b) minimise contamination, activation or the accumulation of waste.
Original PDF page 16 — retained source fields, tables and layout.
8603 Government Gazette 20 March 2025 17
(2) At the siting stage and during the establishment of a new facility, the licensee must
perform a background survey of the site, including obtaining information on radiological conditions,
and the baseline data obtained must be updated prior to the commissioning of the facility.
(3) In the case of an existing facility for which no such background survey has been
made, the licensee must use data from analogous and undisturbed area with similar characteristics.
(4) In a case of a new facility, planning for decommissioning must begin early in the
siting or design stage and must continue throughout the lifetime of the facility up to and including
the decommissioning stage.
(5) Based on the established decommissioning strategy, the licensee must establish an
initial decommissioning plan for the facility and must submit the plan to the Authority together with
the application for a licence to construct, commission and operate the facility.
(6) The initial decommissioning plan must ‒
(a) identify decommissioning options to demonstrate the feasibility of decommissioning;
(b) confirm that sufficient financial resources will be available for decommissioning;
(c) identify categories and estimate quantities of waste that is to be generated during
decommissioning;
(d) confirm that decommissioning can be safely conducted using techniques that are
proven or under development; and
(e) cover environmental aspects of the decommissioning, such as the management of
waste.
(7) The initial decommissioning plan must identify ‒
(a) major existing structures, systems and components that may be used during
decommissioning;
(b) changes or replacements of the structures, systems and components;
(c) the need for new structures, systems and components performing specific safety
functions during decommissioning; and
(d) the need for existing and new facilities to carry out decommissioning and waste
management.
(8) The initial decommissioning plan must be supported by an appropriate safety
assessment for the decommissioning actions, the details of which are commensurate with the
characteristics and status of the facility consistent with a graded approach.
(9) During the operation of the facility, the licensee must update the decommissioning
plan and related safety assessment at least every five years or as otherwise specified by the Authority.
(10) When updating the decommissioning plan, the licensee must consider ‒
(a) the operational experience gained;
(b) the lessons learned from the decommissioning of similar facilities;
Original PDF page 17 — retained source fields, tables and layout.
18 Government Gazette 20 March 2025 8603
(c) new or revised safety requirements;
(d) advance in technological development relevant to the selected decommissioning
strategy;
(e) the occurrence of incident or situation giving rise to consequences relevant to
decommissioning;
(f) any change to the decommissioning strategy; and
(g) any significant deviation from the cost estimate and the scheduled programme of
decommissioning.
(11) For existing facilities where there is no initial decommissioning plan, the licensee
must ‒
(a) prepare a suitable plan for decommissioning reflecting the operational status of the
installation; and
(b) review and update the plan referred to in paragraph (a) every five years or as may be
specified by the Authority.
(12) If a facility is permanently shut down or is no longer used for its intended purpose,
the licensee must submit the final decommissioning plan for approval by the Authority within a
period of one year of permanent shutdown.
Transition from operation to decommissioning
20. (1) The licensee must ensure that the facility is maintained in a safe configuration
during any period of transition following permanent shutdown and until the approval of the final
decommissioning plan.
(2) The licensee must remove operational radioactive waste or nuclear material in the
facility prior to the conduct of decommissioning actions and must transport such material to a facility
authorised by the Authority, and if such removal is not possible during the period of transition, the
licensee must address the removal of such materials as part of the decommissioning plan.
(3) The licensee must notify the Authority as soon as the licensee has made a decision
to permanently shut down the facility.
Final update of decommissioning plan
21. (1) Within a period determined by the Authority, the licensee must prepare and
submit a final update of the decommissioning plan and supporting documents for review and approval
by the Authority before the Authority grants the authorisation to conduct the decommissioning
actions.
(2) During preparation of the final decommissioning plan, the licensee must examine
the facility and determine the quantity and type of radioactive and other hazardous material at the
facility, such as the activated and contaminated structures, systems and components, to ensure that
the final decommissioning plan and the associated safety assessment reflect the real conditions of
the facility.
(3) Where contamination including contamination in subsurface soil and groundwater
or radioactive waste from the operation remains at the facility after permanent shutdown, the licensee
Original PDF page 18 — retained source fields, tables and layout.
8603 Government Gazette 20 March 2025 19
must in the detailed characterisation survey state that such contamination or waste remains at the
facility.
(4) As part of the preparation of the final decommissioning plan, the licensee must
check and update the relevant facility drawings and other documents to reflect the changes that have
been made during the operational period or the transition period.
(5) The final decommissioning plan and supporting documents must cover ‒
(a) the selected decommissioning strategy;
(b) the schedule, type and sequence of decommissioning actions;
(c) the waste management strategy applied, including clearance, the proposed end state
and how the licensee will demonstrate that the end state criteria have been met;
(d) the storage and disposal of the waste from decommissioning;
(e) the timeframe for decommissioning; and
(f) financing for the completion of decommissioning.
Documents in support of decommissioning plan
22. (1) If requested by the Authority, the licensee must submit supporting documents
supplementing individual parts of the decommissioning plan to provide more detailed information
that will facilitate the approval process.
(2) The licensee must submit to the Authority for approval the emergency preparedness
and response plan during decommissioning reflecting the emergency arrangements and any updates.
(3) The licensee must adopt appropriate measures to ensure physical protection and
security at the facility undergoing decommissioning in order to prevent unauthorised access of
individuals and unauthorised removal of radioactive material, and the licensee must implement these
requirements in such a way as not to compromise the safety of the facility.
Other requirements
23. (1) The licensee transporting radioactive material generated during the
decommissioning of a facility must comply with the requirements of the Radiation Protection
and Waste Disposal Regulations.
(2) If safeguarded nuclear material is present during the decommissioning, the
licensee must comply with the applicable nuclear safeguards requirements consistent with the
Agreement Between the Republic of Namibia and the International Atomic Energy Agency for
the Application of Safeguards in Connection with the Treaty on the Non-Proliferation of Nuclear
Weapons, signed on 19 March 1998, and the licensee must implement the requirements in such a
way as not to compromise the safety of the facility.
Deferred dismantling
24. In the case of deferred dismantling, the licensee must, in addition to complying with
the requirements of regulation 21, demonstrate in the decommissioning plan that ‒
Original PDF page 19 — retained source fields, tables and layout.
20 Government Gazette 20 March 2025 8603
(a) the care and maintenance programme will ensure safety during the deferral period
and will not impair future decommissioning; and
(b) the financial resources for the deferral period and the following period of dismantling
are ensured.
PART 7
CONDUCT OF DECOMMISSIONING
Commencement of decommissioning actions
25. (1) The licensee may not commence decommissioning actions until the
authorisation for decommissioning has been granted by the Authority.
(2) The licensee may not commence any additional or altered decommissioning
actions until the decommissioning plan has been updated and the updated version has been approved
by the Authority.
Phased approach
26. (1) When the licensee implements a phased approach to conduct
decommissioning actions, the licensee must describe in the decommissioning plan and supporting
documents all phases necessary to reach the final end state.
(2) In addition to the requirements of subregulation (1), the licensee must in the
decommissioning plan ‒
(a) provide an overview of the decommissioning of the facility;
(b) describe the content, schedule and timeframe of each phase;
(c) make provision for an overarching safety assessment;
(d) specify the end state criteria of each phase; and
(e) demonstrate that earlier phases do not jeopardise the conduct of any later phase.
(3) The licensee must at least for the first phase, develop a detailed safety assessment as
part of the decommissioning plan.
(4) The licensee must develop detailed safety assessments for each phase gradually
and consistently with the progressive implementation of the decommissioning process.
Management of structures, systems and components
27. (1) The licensee must determine whether the structures, systems and
components identified for decommissioning actions fulfil the safety functions.
(2) The licensee must identify and classify the structures, systems and components,
and must reclassify the structures, systems and components as the importance for safety changes
during the course of the decommissioning actions, and the licensee must reflect the classification
or reclassification in the decommissioning plan and supporting documents.
(3) The licensee must maintain and update the list of structures, systems and components
important to safety, and existing structures, systems and components may be reclassified and
Original PDF page 20 — retained source fields, tables and layout.
8603 Government Gazette 20 March 2025 21
progressively removed from service and dismantled as the decommissioning progresses, and the
inspection and maintenance programme for the facility must updated accordingly.
(4) When inspecting compliance with the decommissioning plan, the Authority must
ensure that installation and use of new structures, systems and components are consistent with the
decommissioning plan.
(5) The licensee must address the ageing of structures, systems and components and
other equipment significant to safety by establishing, if necessary, provisions for the maintenance,
testing and inspection of such structures, systems and components and other equipment.
(6) The licensee must record, store, analyse and review data on maintenance, testing,
surveillance and inspection of structures, systems and components and other equipment relevant to
safety.
Feedback of decommissioning experience
28. (1) The licensee must establish and implement arrangements for the feedback
of decommissioning experience through the collection, screening, analysis and documentation of
experience and events at the facility in a systematic way and in a manner that improves and ensures
safe decommissioning.
(2) For the purposes of subregulation (1), the Authority must consider relevant
experience and information on events related to safety, radiation protection and waste
management gained from similar national and international decommissioning projects.
Radioactive waste management
29. (1) In the frame of its radioactive waste management programme, the licensee
must manage all waste streams, including disused radioactive sources, in accordance with the
Radiation Protection and Waste Disposal Regulations.
(2) Before embarking on decommissioning actions, the licensee must ensure the
availability of adequate processing and storage capabilities and transport packages for radioactive
waste generated by the decommissioning.
(3) The licensee must make arrangements for the disposal of radioactive waste
arising from operational activities that remains at the facility and radioactive waste that is to be
generated during decommissioning.
(4) If sufficient disposal capacity is not available at the time of decommissioning, the
licensee must store the radioactive waste safely in accordance with the Radiation Protection and
Waste Disposal Regulations.
(5) The licensee must develop, document and implement arrangements for
characterisation, segregation, volume reduction and further management of the particularly
large quantities and different types of radioactive waste and other residues generated during
decommissioning, including remediation of contaminated areas in accordance with the Radiation
Protection and Waste Disposal Regulations and with the national strategy for the management of
radioactive waste.
(6) The licensee must maintain up to date records of the radioactive waste that is
generated, stored at the facility or transferred to another facility authorised by the Authority, specifying
its quantities, characteristics, treatment methods and destination, including any radioactive waste
and materials that are released from regulatory control.
Original PDF page 21 — retained source fields, tables and layout.
22 Government Gazette 20 March 2025 8603
Management of facility during period of deferral
30. (1) Before the start of the period of deferral, the licensee must ‒
(a) demonstrate that the facility complies with the conditions for the period of deferral
as described in the decommissioning plan;
(b) implement care and maintenance programme developed as part of the
decommissioning plan, the implementation of which ensures safety and does not
impair future decommissioning phases.
(2) The licensee must review periodically the care and maintenance programme
for its appropriateness during the period of deferral focusing on the ageing of the structures,
systems and components.
PART 8
COMPLETION OF DECOMMISSIONING ACTIONS AND TERMINATION OF
AUTHORISATION FOR DECOMMISSIONING
Completion of decommissioning actions
31. (1) On completion of the decommissioning actions, the licensee must prepare
all relevant records concerning the former presence of the facility on the site and the nature of the
activities conducted at that facility for the benefit of future users of the site after its release from
regulatory control.
(2) Based on the records referred to in subregulation (1), the licensee must prepare a
final decommissioning report and submit it to the Authority for review and approval to demonstrate
that the end state of the facility as specified in the decommissioning plan has been reached.
(3) For the purposes of these regulations, decommissioning actions are considered
completed when the end state criteria set by the Authority have been met by the licensee.
(4) Where the future use of the site is restricted, the licensee must specify in the final
decommissioning report any ongoing controls, monitoring and surveillance programme needed for
the site.
Termination of decommissioning authorisation
32. (1) The licensee must demonstrate that the end state specified in the final
decommissioning plan has been reached and is consistent with the requirements and criteria
established by the Authority.
(2) The licensee must address any inputs from the public before the termination of
decommissioning authorisation.
(3) The licensee must apply for the termination of the decommissioning authorisation
after achieving the proposed end state as described in the final decommissioning plan.
(4) Where the licensee makes an application for the release of some parts of the facility
from regulatory control, the remainder of the facility remains subject to regulatory control.
(5) Where a site is released with restrictions on use, the licensee must ‒
(a) ensure that financial resources are available for monitoring, surveillance and control
of the facility throughout the necessary period;
Original PDF page 22 — retained source fields, tables and layout.
8603 Government Gazette 20 March 2025 23
(b) document the restrictions within the final decommissioning report;
(c) establish and ensure that controls and programmes for monitoring and surveillance
can be maintained;
(d) address any inputs from the public.
(6) Any ongoing controls and programmes regarding a site referred to in subregulation
(5) must be approved by the Authority.
On-site storage of radioactive material
33. If the remaining radioactive material, including any radioactive waste, is to be
stored on the site after completion of the decommissioning actions, the licensee must obtain from the
Authority a revised or new authorisation for the storage facility, and the authorisation must include
requirements for the decommissioning of that storage facility.
________________
Original PDF page 23 — retained source fields, tables and layout.