Product approval
A certificate or approval attached to the finished product, component, or radio host.

Describe your device to check whether Electricity Act 1992 compliance may apply, why, what facts are missing, and which official source to review.
A route-by-route answer. Separate product certificates, dossier evidence, import documents, and facility licences stay separate.
Trigger reasoning. See which product facts matter and which missing facts prevent a reliable conclusion.
Official starting points. Open the regulator or government sources behind the maintained country matrix.
Maintained country rule
Evaluates the finished device, adapter, plug, charger, and battery against compulsory product lists. Applies when the product, feature, component, or use is in scope.
Medsafe 'Other legislation': all electrically powered devices must comply with the Electricity Act 1992 and its associated regulations (Energy Safety).
How to read the answer
A device may have one medical risk class and still trigger separate radio, electrical, measurement, radiation, environmental, import, or installation requirements. The checker keeps each regulatory object separate.
A certificate or approval attached to the finished product, component, or radio host.
Testing can belong inside the medical dossier, while some documents apply to each shipment.
Radiation, installation, use, or measurement controls may apply to a facility or operator.
Country-specific scope
Applies when the product, feature, component, or use is in scope.
Applies when the product, feature, component, or use is in scope.
Applies when the product, feature, component, or use is in scope.
Evidence may be required, but the matrix does not identify a generic separate certificate.
Use these authority pages to confirm current scope, technical rules, application routes, and transition dates. A linked source does not turn a preliminary result into an authority decision.
Describe the complete product — radio, power, measurement, radiation, battery, materials, accessories, intended use, import route, and existing approvals. The free checker maps those facts to the maintained New Zealand scheme matrix and links each route to its official source.
Use the result to identify questions and official sources. Final scope can depend on exact models, modules, bands, components, claims, HS codes, import structure, installation site, and current authority interpretation.


Need help confirming a classification or planning your registration?