Nigeria medical device registration timeline
Source-linked clocksNational Agency for Food and Drug Administration and Control (NAFDAC) review clocks and end-to-end planning ranges, using the 4-class (A, B, C, D) — EU-aligned classification system.
| Class / pathway | Review clock | Planning total | With prior approval | Provenance |
|---|---|---|---|---|
| Class A(NAFDAC registration) Guideline: 120 working days; RDRT-038-00 (effective 1 May 2025) standardised clocks across device classes | 120 working days | 7-10 months | — | Verified |
| Class B(NAFDAC registration) Guideline: 240 working days; RDRT-038-00 (effective 1 May 2025) revised the earlier 120-working-day clock to 240 for Class B-D | 240 working days | 1.1-1.5 years | — | Verified |
| Class C(NAFDAC registration) Guideline: 240 working days; RDRT-038-00 (effective 1 May 2025) revised the earlier 120-working-day clock to 240 for Class B-D | 240 working days | 1.1-1.7 years | — | Verified |
| Class D(NAFDAC registration) Guideline: 240 working days; RDRT-038-00 (effective 1 May 2025) revised the earlier 120-working-day clock to 240 for Class B-D | 240 working days | 1.2-2 years | — | Verified |
Nigeria Medical Device Registration Process
Step-by-step NAFDAC registration process. Total estimated timeline: 7-10 months.
Step 1: Pre-Submission Preparation
1-3 monthsGather technical documentation, quality management system (QMS) records, and clinical data required by NAFDAC. Appoint a Nigerian Authorized Representative.
Step 2: Application Submission
1-2 weeksSubmit complete registration dossier to NAFDAC including device description, risk analysis, and testing reports.
Step 3: Administrative Review
2-4 weeksNAFDAC reviews application for completeness. May request additional documents or clarifications.
Step 4: Technical Evaluation
120 working daysIn-depth technical assessment of device safety and performance. NAFDAC may issue questions.
Step 5: Registration Approval
1-2 weeksUpon successful review, NAFDAC issues Nigeria market authorization certificate.
- Local Authorized Representative required for foreign manufacturers
- WHO-listed authorities route: WHO prequalification recognition within 60 working days (about 90 calendar days), plus a 20-working-day notification
- Nigerian content directives may add local-partner requirements