| AMSSNuR authorisation — ionizing-radiation installations, activities and sources(Authorisation from the Agence for the installation or activity and the ionizing-radiation sources associated with it (loi n° 142-12 arts. 7 and 45)) Loi n° 142-12 art. 46: the authorisations are delivered by the Agence within a period of two (2) to six (6) months running from the date of receipt of the complete dossier, and the period is fixed by regulation for each of the classes set by art. 4 of the law. Article 45 makes the authorisation conditional on, among other things, the conformity of the radiation sources to the design and manufacturing standards required for their certification, the radioprotection qualifications of the personnel, and the safety analysis of the installation. The authorisation attaches to the installation, the activity and their operator, so it is separate from the AMMPS device registration and is held at the site of installation and use. The implementing decree is décret n° 2-20-131 du 25 février 2021; its class-by-class rules were not retrieved and are not asserted on this row. |