Authority & regime
- Competent authority
- MHLW (Minister of Health, Labour and Welfare) grants device/IVD marketing approval (承認, Art. 23 2 5(1)); PMDA (機構) conducts the approval review and QMS conformity surveys on MHLW's behalf (…

Research PMDA registration records, classification, regulations, timelines, fees, and market updates — the stable entrance to every Japan medical device resource.
Search official PMDA device registration records.
Explore market trends, registrations, manufacturers, and local representatives.
Browse official PMDA regulations and guidance documents.
Compare official and realistic approval times by device class and pathway.
Review current PMDA application, review, and renewal fees.
Estimate the likely PMDA pathway, government fees, dossier preparation time, review timeline, and registration steps.
Follow recent PMDA policy, guidance, and compliance updates.
Describe your device and get a preliminary PMDA risk class with an explanation and source links.
Check whether product features may trigger separate radio, electrical, metrology, radiation, import, or other Japan requirements.
Describe a device and find comparable products in the PMDA registration database.
Browse source-linked lifecycle, language, local-role, renewal, and change-control facts.
Common questions about changing a registered medical device in Japan. Each question separates published rules from details still awaiting verification.
24 of 25 research dimensions currently covered · 31 official sources · latest verification 2026-10-21
PMDA registration fees in JPY · reviewed 2026-08-25
| Fee line | Amount | Provenance |
|---|---|---|
| Shonin - Class II/III (Follow-on) | ¥1,879,900 | Verified |
| Shonin - Class IV (Follow-on) | ¥3,080,600 | Verified |
| Shonin - Class II/III (New, no clinical) | ¥11,816,400 | Verified |
| Shonin - Class IV (New, no clinical) | ¥16,520,700 | Verified |
Pharmaceuticals and Medical Devices Agency (PMDA) review clocks and planning ranges · 4-class (I, II, III, IV) classification
| Class / pathway | Review clock | Planning total | Provenance |
|---|---|---|---|
| Class I (一般医療機器)(Pre-marketing notification (製造販売届, Todokede) to PMDA) PMDA states plainly that it does not review the notification (提出された届書については審査を行いません) — it is filed on the notifier’s own responsibility, so there is no decision period to wait out Art. 23-2-12(1) requires only that the notification be filed in advance of marketing; the product may be placed on the market from that point No fee is payable for the notification, unlike the certification and approval routes The manufacturer/marketer licence (製造販売業許可, third class or above) from the prefecture and the manufacturing-site registrations must already be in place before the notification is filed — those are the real lead time Any change to a notified item must be filed within 30 days of the change date; a late filing needs a written explanation of delay to the PMDA Chief Executive A Class I device with no matching JMDN general name, or one that is genuinely new, falls out of this route and into an approval application instead | 0 days | 0 days | Verified |
| Third-party certification (認証)(Registered certification body (登録認証機関) under Art. 23-2-23) Zero is recorded because the government sets no clock here, not because certification is instant: Enforcement Regulation Art. 129(3)(i) makes each registered certification body state its own standard processing period in the business rules it files for MHLW approval, so the period is per-body and there is no national figure to publish MHLW notice 医薬機審発0306第1号 (6 March 2026) is what spells out that requirement for the business rules Example of what an approved set of business rules actually commits to: SGS Japan’s 実施規程 gives up to 2 months from receipt to the start of review, review effort measured in assessor-days (1.5-5.0 for the standards-conformity assessment), and 15 business days for technical review plus issue of the certificate This is the route for 指定高度管理医療機器等 — Class II and the designated part of Class III for which MHLW has issued a certification standard (認証基準) The route is not elective. If a certification standard exists and the device meets it, certification is mandatory; if no standard exists or the device falls outside it, the device goes to PMDA approval instead and picks up the application-category target below A QMS conformity investigation must be applied for to the same certification body alongside the certification application (Art. 23-2-23(3)) | 0 days | 5-6 months | Verified |
| New medical device application (新医療機器)(PMDA approval review (Shonin)) PMDA publishes this target by application type, not by risk class; priority-review new devices have a 9-month target The figure comes from MHLW’s 2008 医療機器の審査迅速化アクションプログラム, and PMDA prints a caveat next to it: it is a guide to the review period, not a promise that approval will land inside it PMDA separately commits to a mid-term-plan target of 14 months at the 80th percentile for ordinary new devices and 10 months at the 80th percentile for priority items — a longer number than the 12-month guide because it is a tile value rather than a midpoint Observed process split (25th–median–75th percentile of total elapsed time, PMDA standard-process timeline): 1.2-1.4-1.7 months application to product briefing, 1.8-3.0-3.7 to the main round of questions, 3.7-4.8-5.3 through the answer cycles, 2.3-2.8-3.6 for expert consultation, 0.2-0.2-0.9 from review report to approval Items that must go to the Pharmaceutical Affairs and Food Sanitation Council device committee run 11.0-12.0-12.0 months in total; items that skip committee run 3.7-7.1-10.1 Reliability and QMS investigations run in parallel with the technical review rather than after it PMDA has reported a review lag against the United States of zero for new devices every year since FY2013; the remaining gap Japan measures is the development lag, which is when companies choose to file | 12 months | 7.1-12 months | Verified |
| Improved device — clinical data (改良医療機器(臨床あり))(PMDA approval review (Shonin)) PMDA publishes this target by application type, not by risk class Mid-term-plan target is stated differently again: 10 months at the 60th percentile Observed process split (25th–median–75th percentile): 0.2-0.8-1.6 months to product briefing, 0.5-3.1-5.7 to the main questions, 2.8-3.4-4.0 through answer cycles, 1.9-2.1-2.6 for expert consultation, 0.1-0.2-0.2 from review report to approval, for 6.5-8.4-8.8 in total | 9 months | 6.5-8.8 months | Verified |
Newest official PMDA headlines from the daily-refreshed feed — every row links directly to the authority publication.
Official PMDA rules and guidance · 37 of 37 documents linked to official sources
Computed from 26,105 official PMDA certificate records · data as of 2026-09-18
The target market is carried into each tool. Add the product, evidence, or regulatory change you want to assess.
Structure company, product, model, approval, certificate, and evidence facts before starting Japan work.
Connect the PMDA route, evidence, labels, local role, timing, and dependencies to a wider launch plan.
Compare an existing authorization and evidence set against PMDA administrative, testing, labeling, and dossier needs.
Map a product or manufacturing change to PMDA evidence, notification, timing, and implementation questions.
Assess a current PMDA update against one product and turn it into an owner-ready action workpaper.
Review connected-device architecture, risks, SBOM, testing, lifecycle controls, and market-specific questions for Japan (PMDA).

